The arrival of the first of 17 truck loads of dirt
has arrived and the ramp is going up to assist in getting the wheelbarrow to the
top of the 3-foot walls.

The ramp is up and the brigade of wheelbarrows
begins.

The beds are now full and ready for the next phase.
The grass has been replaced with brick. In the confined area it turned out
to be too difficult to mow.

